TM 5-2420-230-24-1
NOTE
Ensure all hoses and tubes are disconnected and clear before removal.
Remove cable ties as necessary.
Tag all hoses and tubes and note their positions before removal.
Cap and plug all tubes, hoses, and fittings upon removal.
(1)
(2)
If required, refer to general bushing replacement (Para 17-6).
b. Installation.
Use care when removing or installing snap and retaining rings. Snap and retaining rings are under
spring tension and can act as projectiles when released and could cause severe eye injury.
c. Follow-On Maintenance.
(1)
(2)
(3)
END OF TASK
H-5