a. Removal.
The cutting edge is heavy. To avoid personal
injury, exercise extreme care when manually
handling the cutting edge. Failure to comply
may result in injury to personnel.
Remove 10 nuts (1), bolts (2), and cutting edge (3).
b. Installation.
Install cutting edge (3) with 10 bolts (2) and
nuts (1).
c. Follow-On Maintenance.
END OF TASK
This Task Covers:
a. Removal
b. Inspection
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer (2)
Tools and Special Tools
References
None
Drawings Required
Figure 153
Materials/Parts
Figure 154
Figure 155
Figure 160
Figure 161
Figure 162
Equipment Conditions
Figure 164
TM or Para
Condition Description
Vehicle positioned on level
Figure 166
ground.
Figure 168
Parking brake applied.
Figure 172
Engine shut OFF.
Electrical master switch OFF.
Estimated Time to Complete
"Do Not Operate" tag attached
to ignition switch.
Component removed as
required.
Change 1