TM 5-2420-230-24-1
(11) Connect wiring (1) for tilt-position
potentiometer (2).
(12) Position cushion clamp (5) on wire harness.
Install cushion clamp (5) with washer (4)
and bolt (3). Tighten bolt.
f. Follow-On Maintenance.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
ground.
Tools and Special Tools
Materials/Parts
None
ignition switch.
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Drawings Required
References
None
Estimated Time to Complete Task
Change 1