• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GENERAL BUSHING REPLACEMENT. - Continued
4-IN-1 BUCKET REPAIR. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  631    632    633    634    635  636  637    638    639    640    641  
img
. . . . . . . . . . . . . . . . .
TM 5-2420-230-24-1
17-7. 4-IN-1 BUCKET REPAIR.
This Task Covers:
a. Disassembly
b. Assembly
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Field maintenance, basic, Item 23, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
4-in-1 bucket removed.
Equipment, suitable lifting
TM 5-2420-230-10
Bucket teeth removed.
TM 5-2420-230-10
Ripper teeth removed
(if required).
Materials/Parts
Bushing, Item 27, Appendix D (2)
Para 17-5
Cutting edge removed.
Bushing, Item 28, Appendix D (2)
Para 10-25
4-in-1 bucket cylinder removed.
Dunnage, suitable
Grease, automotive and artillery, GAA, Item 30,
Drawings Required
Appendix C
TM 5-2420-230-24P Figure 162
Grease, electrical, Item 32, Appendix C
Nut, self-locking, Item 112, Appendix D (2)
Estimated Time to Complete Task
Nut, self-locking, Item 115, Appendix D (5)
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Disassembly.
Ensure that the bucket is directly supported before assembly/disassembly. Failure to comply may
result in serious injury or death to personnel.
(1)
Remove four bolts (1), washers (2),
clamps (3), and two hose assemblies (4)
from bucket (5).
17-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.