TM 5-2420-230-24-1
b. Installation.
Tilt linkages are heavy. Use an appropriate lifting device and follow safe working procedures when
lifting or moving tilt linkages. Failure to comply may result in injury or death to personnel.
Ensure pins are lubricated before installing. Failure to comply could result in damage to equipment.
(1)
Attach suitable lifting device and sling to tilt linkage (5).
(2)
Use lifting device to position tilt linkage (5)
and install forward side of tilt linkage (5)
with pivot pin (8), bolt (7), and nut (6).
(3)
Install bolt (2), washer (3), and new self-
locking nut (1) through pivot arm (4) and
rear side of tilt linkage (5).
c. Follow-On Maintenance.
(1)
Start engine and functionally test linkages
(2)
(3)
END OF TASK
This Task Covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Bucket in dig position.
Hydraulic system pressure
Materials/Parts
released.
Grease, automotive and artillery, Item 30, Appendix C
Drawings Required
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer
Change 1