• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STANDARD HYDRAULIC PROCEDURES.
Release Hydraulic System Pressure.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  309    310    311    312    313  314  315    316    317    318    319  
img
. . . . . . . . . . . . .
TM 5-2420-230-24-1
10-4. RESTORE IHMEE TO OPERATIONAL READINESS.
Upon completion of maintenance activities, restore power and return vehicle to operational readiness using following
procedure:
(1)
Place electrical master switch in ON position (TM 5-2420-230-10).
(2)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
(3)
Ensure parking brake is applied (TM 5-2420-230-10).
(4)
Start engine (TM 5-2420-230-10).
(5)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position, as required
(TM 5-2420-230-10).
(6)
Complete necessary documents and return IHMEE to relevant authority.
10-5. RELEASING HYDRAULIC PRESSURE.
This Task Covers:
a. Release Hydraulic System Pressure
b. Release FEL Lift and Tilt Cylinder Hydraulic System Pressure
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
FO-4, Hydraulic schematic
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanics, Item 38, Appendix B
TM or Para
Condition Description
Hydraulic valve manual override lever, BII,
TM 5-2420-230-10
FEL and backhoe travel stops
TM 5-2420-230-10
deployed.
TM 5-2420-230-10
Engine access panel removed.
TM 5-2420-230-10
Backhoe valve guard removed
Materials/Parts
None
(for backhoe valve only).
Personnel Required
Drawings Required
MOS 62B, Construction Equipment Repairer
None
Estimated Time to Complete
0.3 hr.
Change 1
10-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.