TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Equipment Conditions
Tools and Special Tools
TM or Para
Condition Description
Engine shut OFF.
Hood raised.
Materials/Parts
Cooling system drained.
Drawings Required
Personnel Required
Estimated Time to Complete Task
MOS 62B, Construction Equipment Repairer
a. Removal.
(1)
Remove two bolts (1) and water pump (2)
from engine (3).
(2)
Remove gasket (4). Discard gasket.
b. Installation.
Install new gasket (4) and water pump (2) on
engine (3) with two bolts (1).
c. Follow-On Maintenance.
END OF TASK
Change 1