TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Equipment Conditions
Tools and Special Tools
TM or Para
Condition Description
Radiator removed.
Materials/Parts
Drawings Required
Personnel Required
Estimated Time to Complete Task
MOS 62B, Construction Equipment Repairer
a. Removal.
Remove 10 bolts (1), lockwashers (2), washers (3), and
b. Installation.
Install 10 washers (3), new lockwashers (2), and bolts (1)
to secure fan shroud (4) to the radiator (5).
c. Follow-On Maintenance.
END OF TASK