• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FEL LIFT CYLINDER REPLACEMENT - Continued
TILT CYLINDER MAINTENANCE - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  356    357    358    359    360  361  362    363    364    365    366  
img
. . . . . . . . . . . . . . . . .
TM 5-2420-230-24-1
10-23. TILT CYLINDER MAINTENANCE.
This Task Covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer (2)
References
Tools and Special Tools
None
Field, maintenance, basic, Item 23, Appendix B
Pan, drain, Item 29, Appendix B
Equipment Conditions
Tool kit, general mechanics, Item 38, Appendix B
TM or Para
Condition Description
Equipment, suitable lifting
TM 5-2420-230-10
Bucket on ground.
Para 10-5
Hydraulic system pressure
Materials/Parts
released.
Cap and plug set, Item 4, Appendix C
Para 12-35
Tilt-position potentiometer
Cloth, lint-free, Item 10, Appendix C
removed.
Grease, automotive and artillery, Item 30, Appendix C
Nut, self-locking, Item 114, Appendix D
Drawings Required
Tags, identification, Item 63, Appendix C
TM 5-2420-230-24P Figure 155
Ties, cable, Item 68, Appendix C
TM 5-2420-230-24P Figure 161
Estimated Time to Complete Task
Refer to MAC in Appendix B
a. Removal.
NOTE
Ensure all hoses and tubes are disconnected and clear before removal.
Remove cable ties as necessary.
Tag all hoses and tubes and note their positions before removal.
Cap and plug all tubes, hoses, and fittings upon removal.
Both tilt cylinders are removed and installed in the same way. Right side is shown.
Change 1
10-50


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.