TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer (2)
References
Tools and Special Tools
None
Equipment Conditions
TM or Para
Condition Description
Equipment, suitable lifting
Bucket on ground.
Hydraulic system pressure
Materials/Parts
released.
Tilt-position potentiometer
removed.
Grease, automotive and artillery, Item 30, Appendix C
Drawings Required
Estimated Time to Complete Task
a. Removal.
NOTE
Ensure all hoses and tubes are disconnected and clear before removal.
Remove cable ties as necessary.
Tag all hoses and tubes and note their positions before removal.
Cap and plug all tubes, hoses, and fittings upon removal.
Both tilt cylinders are removed and installed in the same way. Right side is shown.
Change 1