• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SWING TOWER REPLACEMENT.
BOOM REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  985    986    987    988    989  990  991    992    993    994    995  
img
. . . . . .
TM 5-2420-230-24-1
NOTE
Ensure all hoses and tubes are disconnected and clear before removal.
Remove cable ties as necessary.
Tag all hoses and tubes and note their positions before removal.
Cap and plug all tubes, hoses, and fittings upon removal.
(1)
Refer to page H-39 for removal.
(2)
If required, refer to general bushing replacement (Para 17-6).
b. Installation.
Use care when removing or installing snap and retaining rings. Snap and retaining rings are under
spring tension and can act as projectiles when released and could cause severe eye injury.
Refer to page H-40 for installation.
c. Follow-On Maintenance.
(1)
Return backhoe to stowed position (TM 5-2420-230-10).
(2)
Install backhoe valve guard (TM 5-2420-230-10).
(3)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
END OF TASK
H-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.