TM 5-2420-230-24-1
This Task Covers:
a. Disassembly
b. Inspection
c. Assembly
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer (2)
Tools and Special Tools
References
None
Equipment Conditions
TM or Para
Condition Description
Vehicle raised.
Equipment, suitable lifting
Brakes caged.
Wheels and tires removed.
Hub oil drained.
Materials/Parts
Drawings Required
Estimated Time to Complete Task
a. Disassembly.
(1)
(2)
Refer to page J-34 to disassemble the hub, annulus and brake drum units.
b. Inspection.
Refer to page J-33 for inspection of the planet carrier.
Change 1