• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVAL OF COMPLETE DRIVE HEAD ASSEMBLY
COMPLETE OVERHAUL OF DRIVE HEAD ASSEMBLY

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  1136    1137    1138    1139    1140  1141  1142    1143    1144    1145    1146  
img
TM 5-2420-230-24-1
Spicer Speciality Axle Division - Technical Publications
SECTION 2
REMOVAL OF COMPLETE DRIVE HEAD ASSEMBLY Continued.
Note:- Part nos. marked (*) refer to drawing FH55
2.9
Remove axle casing setscrews and nuts (110 & 113*) then support hub / steering head unit with sling
through eye bolt and pull unit from axle casing.
2.10
Fit tool E467 into position on U.J. / axle casing assembly and tighten to pull U.J. from axle casing as
shown in fig.no.3
2.11
Repeat operations 2.3 to 2.10 for other hub assembly.
U.J. assembly
Extractor screws
Tool E467
Lock pin
Fig. No. 3
2.12
Remove axle casing nuts (10) with washers (11) then scribe a line on diff flange o/dia. (12) and axle
casing (25) to aid re-assembly.
Support drive head with a suitable sling and fit 2 off 7/16 " UNF x 11/2 " long extractor bolts into tapped
2.13
holes provided in axle flange and tighten evenly to draw drive head from axle casing (25).
2.14
Remove sealant from axle and gear casing mating faces (25 & 12) using Loctite Chisel Gasket
Remover or by carefully scraping from faces.
Page No.C5
Manual No. 1785 Issue A
Spicer Speciality Axle Division
J-69


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.