• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FLYWHEEL HOUSING REPLACEMENT.
FUEL TRANSFER PUMP REPLACEMENT.

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  27    28    29    30    31  32  33    34    35    36    37  
img
. . . . . . . .
TM 5-2420-230-24-2
L-26. INJECTION PUMP REPLACEMENT.
This Task Covers:
a. Removal
b. Adjustment
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer
Tools and Special Tools
References
Engine barring tool, Item 2, Appendix B
None
Field maintenance, basic, Item 23, Appendix B
Tool kit, common no. 2, Item 36, Appendix B
Equipment Conditions
Tool kit, general mechanics, Item 38, Appendix B
TM or Para
Condition Description
TM 5-2420-230-10
Hood raised.
Materials/Parts
STP, Item 29, Appendix C
Drawings Required
Washer, lock, Item 279, Appendix D (2)
TM 5-2420-230-24P Figure 36
Estimated Time to Complete
Refer to MAC in Appendix B
a. Removal.
No smoking, flames, sparks, or glowing or hot objects allowed within 50 ft. (15 m) of vehicle.
Failure to comply may result in injury or death to personnel.
To prevent possible injury, wear gloves and protective eye equipment when handling fuel. Failure
to comply may result in injury or death to personnel.
Keep a fire extinguisher within easy reach when working with fuel or on a fuel system.
Do not work on fuel system when engine is hot; fuel can be ignited by a hot engine.
Refer to page L-115 for removal.
b. Adjustment.
Refer to page L-319 for timing.
c. Installation.
Refer to page L-169 for installation.
d. Follow-On Maintenance.
Close engine hood and attach clips (TM 5-2420-230-10).
END OF TASK
L-31
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.