• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUEL TRANSFER PUMP REPLACEMENT.
ENGINE OIL COOLER REPLACEMENT.

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  29    30    31    32    33  34  35    36    37    38    39  
img
. . . . . . .
TM 5-2420-230-24-2
L-28. ENGINE REPAIR (TAPPET COVER REPLACEMENT).
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para L-26
Injection pump removed.
Materials/Parts
Drawings Required
Gasket, tappet cover, Item 61, Appendix D
TM 5-2420-230-24P Figure 22
Packing, preformed, Item 167, Appendix D (4)
Estimated Time to Complete
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
Refer to page L-117 for removal.
b. Installation.
Refer to page L-159 for installation.
c. Follow-On Maintenance.
Install injection pump (Para L-26).
END OF TASK
L-33
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.