• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OIL PAN REPLACEMENT.
ENGINE REPAIR (REAR SEAL HOUSING REPLACEMENT).

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  33    34    35    36    37  38  39    40    41    42    43  
img
. . . . . . .
TM 5-2420-230-24-2
L-32. SUCTION TUBE REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para L-31
Oil pan removed.
Materials/Parts
Drawings Required
Three Bond 1207-C, Item 67, Appendix C
TM 5-2420-230-24P Figure 21
Gasket, Item 79, Appendix D
Estimated Time to Complete
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
Fuel and oil are slippery and can cause falls. To avoid injury, wipe up spilled fuel or oil with rags.
Refer to page L-119 for removal.
b. Installation.
Refer to page L-156 for installation.
c. Follow-On Maintenance.
Install oil pan (Para L-31).
END OF TASK
L-37
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.