• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Injection Pump Repairs - Bosch VE
Shutdown Solenoid - Replacement (5-04)

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  308    309    310    311    312  313  314    315    316    317    318  
img
TM 5-2420-230-24-2
Injection Pump Repairs - Bosch VE (5-01)
Section 5 - Fuel System - Group 05
Page 5-16
B Series Shop Manual
Protective Sleeve Part No. 3376936
Install the new seal onto the shaft using a protective
sleeve.
Drive the seal in until it bottoms in the seal bore.
Service Tip: A deep well socket that contacts the outside
diameter (metal surface) of the seal will work adequately
to drive in the new seal.
Delivery Valve Holder/Sealing Washer -
Replacement (5-03)
14 mm
Remove the delivery valve holder, shim (if used), delivery
valve and sealing washer.
Inspect the sealing surfaces on the high pressure head,
the delivery valve and the delivery holder.
Install the delivery valve holder assembly and new seal-
ing washer as illustrated.
L-314


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.