• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Speed Droop Governor (005-058)
Fuel Pump Back Leakage Valve - Continued

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  939    940    941    942    943  944  945    946    947    948    949  
img
TM 5-2420-230-24-2
B3.9 and B5.9 Series Engines
Fuel Pump Back Leakage Valve (005-059)
Section 5 - Fuel System - Group 05
Page 5-95
Speed Droop Adjustment
NOTE: If serious surging occurs during the warm-up pe-
riod, turn the speed droop adjusting screw clockwise until
the surging stops.
NOTE: When the speed droop adjustments are made, it is
necessary to adjust the throttle position.
Adjust the governor as follows:
1. Operate the engine until normal operating tempera-
ture is obtained 91C [195F].
2. When the engine reaches operating temperature, po-
sition the throttle to attain rated speed, and apply 100-
percent load. Adjust the throttle position as necessary
to obtain 100 percent performance.
3. Remove the load, and check for the specified no-load
or, in the case of a generator set, note the frequency.
If the no-load speed is incorrect, loosen the locking
cap, and adjust the speed droop adjusting screw
(clockwise for increased droop, counterclockwise
for less droop). If surging occurs when the load is
removed, turn the adjusting cap clockwise to elimi-
nate the surge. Tighten the locking cap to secure the
adjusting screw.
4. Check the 100-percent load and no-load performance
again, and make adjustments as necessary.
Fuel Pump Back Leakage Valve
(005-059)
Preparatory (005-059-000)
17 mm
Disconnect the high-pressure line. Refer to Procedure 006-
051.
NOTE: Because the valves are installed 90 degrees to the
pump axis, the pump will possibly need to be removed to
change the valves close to the cylinder block.
Remove (005-059-002)
CAV
16 mm
Remove the valve.
L-955


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.