• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 15. Loading Operation
Figure 19. Clamshell Operation

Technical Manual For High Mobility Engineer Excavator Type I \(Nsn 2420-01-535-4061\)
Page Navigation
  151    152    153    154    155  156  157    158    159    160    161  
img
TM 5-2420-232-10
0005
4-IN-1 BUCKET OPERATIONS CONTINUED
Grading Operation
0001
0005
1.
The bucket can be used to level an uneven surface by removing material from high spots and depositing the removed
material into the troughs.
2.
Open the clam (Figure 17, Item 1).
3.
When operating the machine forwards position the bucket as shown (Figure 17). When operating the machine in reverse
position the bucket as shown (Figure 18).
4.
Put the transmission in first gear forward or reverse as applicable. Drive the machine straight over the surface to be graded
and at the same time raise or lower the bucket to obtain the best grading result.
435-A1774
Figure 17. Grading Operation - Forward Travel
05
Figure 18. Grading Operation - Reverse Travel
05
0005-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.