• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLE WATER PUMP - Continued
INSTALL WATER PUMP - Continued

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  337    338    339    340    341  342  343    344    345    346    347  
img
TM 5-3805-280-24-2
Cooling System
INSTALL WATER PUMP
25
18
1. Install pulley (A) onto water pump (B). Tighten cap
screws to specifications.
Water Pump Pulley--Specification
Torque ............................................................................ 16 Nm (12 lb-ft)
2. Clean gasket surfaces. Using a new gasket, install
water pump onto timing gear cover. Tighten cap
screws to specifications.
Water Pump-to-Timing Cover--Specification
A--Pulley
B--Water Pump
Torque ............................................................................. 16 Nm (12 lb-ft)
Continued on next page
RG,25,JW7553
1920NOV971/2
13-341


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.