• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL JT07158 (OR FKM10429A) TIME TRAC KIT
CHECK ROTARY INJECTION PUMP RATED LOAD DYNAMIC TIMING - Continued

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  540    541    542    543    544  545  546    547    548    549    550  
img
TM 5-3805-280-24-2
Fuel System Operation and Tests
115
5. Use JDE81-4 Timing Pin in flywheel timing hole (D) to
18
ensure engine is NOT stopped at TDC. Magnetic
pick-up probe will enter TDC timing hole in flywheel
and be damaged when engine is started. An air gap of
0.64 mm (0.025 in.) is recommended between tip of
probe and flywheel face.
6. Install JDG793 Threaded Magnetic Pick-up Adapter (B)
into flywheel housings with tapped hole until it bottoms.
Insert probe of magnetic pickup (A) into adapter until it
contacts flywheel. Back out hex head of adapter two
flats and tighten lock nut; this will provide
recommended air gap.
A--Magnetic Pick-Up
B--JDG793 Threaded Magnetic Pick-Up Adapter
7. Install JDG821 Tapered Magnetic Pick-up Adapter (C)
C--JDG821 Tapered Magnetic Pick-Up Adapter
into flywheel housings without tapped hole. Lightly tap
D--Flywheel Timing Hole
adapter to lock into position. Insert probe into adapter
until it contacts the flywheel. Pull probe back out to
provide 0.64 mm (0.025 in.) gap.
8. Plug magnetic pick-up connector into JT07170 meter
port marked MP.
RG,115,JW7711
1924NOV973/9
CHECK ROTARY INJECTION PUMP RATED LOAD
DYNAMIC TIMING:
1. Engine OFF. Push ON/CLEAR button.
Display shows: R=0
Continued on next page
RG,115,JW7711
1924NOV974/9
13-545


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.