• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COMPLETE FINAL ASSEMBLY ON EXHAUST MANIFOLD SIDE OF ENGINE
Cylinder Block, Liners, Pistons, and Rods

Technical Manual For Hydraulic Excavator Model 330Lcr 2
Page Navigation
  132    133    134    135    136  137  138    139    140    141    142  
img
.
TM 5-3805-281-24-2
Cylinder Head and Valves
PERFORM ENGINE BREAK-IN
1. Run engine at slow idle no load for 2 minutes. Check
for liquid leaks.
2. Increase RPM to fast idle, then load down to 50 rpm
above rated speed for 20 minutes.
NOTE: Dynamometer is the preferred load control, but
engine can be loaded by matching drag loads to
gear selection.
3. Recheck valve clearance and adjust as necessary.
(See CHECK AND ADJUST VALVE CLEARANCE,
earlier in this group.)
4. Install rocker arm cover gasket and cover. Tighten
rocker arm cover cap screws to 8 N m (6 lb-ft)
(72 lb-in.). (See COMPLETE FINAL ASSEMBLY OF
INJECTION PUMP SIDE OF ENGINE, earlier in this
group.)
Retorque of cylinder head cap screws after engine
break-in is not required.
IMPORTANT: After engine break-in, follow ALL
recommended hourly service intervals
outlined in your Operator's Manual.
RG,RG34710,1107
1923OCT971/1
11-136


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.