• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUEL SHUT-OFF SOLENOID LINKAGE CHECK AND ADJUSTMENT
ESSENTIAL TOOLS

Technical Manual For Hydraulic Excavator Model 330Lcr 2
Page Navigation
  456    457    458    459    460  461  462    463    464    465    466  
img
TM 5-3805-281-24-2
Speed Controls
8. Connect ball joint to fuel shut-off lever using cap screw
(B) and nut (E).
IMPORTANT: Failure to have the shut-off lever tight
against run position stop (upper stop)
can result in low engine horsepower.
9. Turn the key switch to ON.
Push plunger into solenoid housing so hold coil holds
the plunger in the run position.
Check that shut-off lever is tight against run position
stop using a 0.025 mm (0.001 in.) feeler gauge. If
feeler gauge passes between shut-off lever and stop,
shorten the linkage two more turns.
10. Turn key switch to OFF.
The spring inside the solenoid housing boot will
extend the plunger to push the shut-off lever down to
the stop position stop (lower stop ) (G).
05
0515
15
Check that shut-off lever is within the specified
distance of stop position stop.
Fuel Shut-Off Lever-to-Stop Position Stop--Specification
Distance..................................................... within 3 mm (0.125 in.) of stop
position stop
CED,OUOE003,1087
1908SEP982/2
12-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.