TM 5-3805-294-10
0030
STARTING - Continued
19.
Operate travel lever for raised track for approximately 5 minutes. (WP 0004)
20.
Slowly raise boom (Figure 10, Item 5) to lower track (Figure 10, Item 7) to ground and swing upperstructure
back 90 degrees.
21.
Repeat Steps 14 to 18 for opposite track.
END OF TASK
END OF WORK PACKAGE
0030-7/8 blank