TM 5-3805-294-10
0031
STARTING - Continued
5
6
3
7
4
HYEX01435
Figure 10.
Raise Machine.
18.
Place round side of bucket (Figure 10, Item 4) on ground.
19.
Keeping angle between boom (Figure 10, Item 5) and arm (Figure 10, Item 6) between 90 and 110 degrees,
slowly lower boom (Figure 10, Item 5) to raise track (Figure 10, Item 7) off ground.
20.
Operate travel lever for raised track for approximately 5 minutes. (WP 0004)
21.
Slowly raise boom (Figure 10, Item 5) to lower track (Figure 10, Item 7) to ground and swing upperstructure
back 90 degrees.
22.
Repeat Steps 15 to 19 for opposite track.
END OF TASK
END OF WORK PACKAGE