TM 5-3805-294-23-4
0609
INSTALLATION - Continued
5.
Install three bolts (Figure 4, Item 1) and washers (Figure 4, Item 2) to valve mount plate (Figure 4, Item 3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install air cleaner. (Volume 3, WP 0456)
2.
3.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE
0609-4