MIRROR REPLACEMENT. - Continued
BATTERY STOWAGE BOX MAINTENANCE.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  541    542    543    544    545  546  547    548    549    550    551  
img
. . . . . . . . .
TM 5-2420-230-24-1
13-26. MIRROR BRACKET REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Para 12-43
Mirror clearance light removed.
Tools and Special Tools
Para 13-25
Mirror removed.
Tool kit, general mechanics, Item 38, Appendix B
Drawings Required
Materials/Parts
TM 5-2420-230-24P Figure 194
Nut, self-locking, Item 102, Appendix D (6)
TM 5-2420-230-24P Figure 195
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
Refer to MAC in Appendix B
References
None
a. Removal.
NOTE
The left and right side remove and install the same way. Left side is shown.
(1)
Remove cover (1) from mirror assembly (2).
(2)
Remove four self-locking nuts (3),
washers (4), and bolts (5) from mirror
assembly (2) and lower bracket (6). Discard
self-locking nuts.
(3)
Remove two self-locking nuts (7),
washers (8), screws (9), and mirror
assembly (2) from upper bracket (10).
Discard self-locking nuts.
NOTE
Perform Steps (4) through (6) only if
brackets need to be replaced.
(4)
Remove nut (11), washer (12), and
buffer (13) from lower bracket (6).
(5)
Remove bolt (14), washer (15), and lower
bracket (6) from vehicle.
(6)
Remove two bolts (16), washers (17), and
upper bracket (10) from vehicle.