• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY STOWAGE BOX MAINTENANCE. - Continued
BATTERY STOWAGE BOX MAINTENANCE. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  545    546    547    548    549  550  551    552    553    554    555  
img
TM 5-2420-230-24-1
(7)
Remove nut (20) from lower end of tool box
door strut (21).
(8)
Remove nut (22) from upper end of tool box
door strut (21).
(9)
Remove tool box door strut (21).
(10) Remove seven rivets (23) from tool box door
hinge (24). Discard rivets.
(11) Remove tool box door (1).
(12) If required, remove seal (25) from tool box
door (1).
(13) If required, remove blanking grommet (26)
from battery stowage box (5). Discard
blanking grommet.
c. Assembly.
(1)
If removed, install new blanking grommet (26) in battery stowage box (5).
(2)
If removed, install new seal (25) on tool box door (1).
(3)
Install tool box door (1) with seven new rivets (23).
(4)
Install tool box door strut (21) with nuts (20) and (22).
Change 1
13-50


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.