TM 5-2420-230-24-1
This Task Covers:
a. Adjustment
b. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
None
"Do Not Operate" tag attached
to ignition switch.
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Drawings Required
None
References
None
Estimated Time to Complete Task
a. Adjustment.
b. Follow-On Maintenance.
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Drag link removed.
Drawings Required
Materials/Parts
Grease, automotive, artillery, Item 30, Appendix C
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer
Change 1