• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AXLE STOP ADJUSTMENT.
POWER STEERING PRESSURE AND FLOW TESTING.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  1206    1207    1208    1209    1210  1211  1212    1213    1214    1215    1216  
img
. . . . . . . . . .
TM 5-2420-230-24-1
a. Removal.
Refer to page K-58 for removal.
b. Installation.
Refer to page K-60 for installation.
c. Follow-On Maintenance.
Install drag link (Para 5-15).
END OF TASK
K-6. FINAL ADJUSTMENTS.
This Task Covers:
a. Adjustment
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2 Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para 5-9
Power steering gear box
installed.
Materials/Parts
None
Drawings Required
None
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
Refer to MAC in Appendix B
a. Adjustment.
Refer to page K-108 for adjustment.
END OF TASK
Change 1
K-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.