TM 5-2420-230-24-2
L-12. TURBOCHARGER REPLACEMENT.
This Task Covers:
a. Removal
b. Cleaning
c. Inspection
d. Installation
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer
Tools and Special Tools
References
Tool kit, common no. 2, Item 36, Appendix B
None
Tool kit, general mechanics, Item 38, Appendix B
Equipment Conditions
Materials/Parts
TM or Para
Condition Description
Antiseize compound, Item 12, Appendix C
Hood raised.
Oil, lubricating, OE/HDO 30, Item 44, Appendix C
Adhesive, sealant, Item 25, Appendix C
Drawings Required
Solvent, degreasing, Item 58, Appendix C
Gasket, Item 62, Appendix D
Gasket, Item 76, Appendix D
Estimated Time to Complete
Refer to MAC in Appendix B
a. Removal.
Allow engine to cool before performing maintenance on the muffler, exhaust pipe, exhaust manifold,
or turbocharger. If necessary, use insulated pads and gloves.
Change 1