• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE REPAIR (FAN HUB REPLACEMENT).
TURBOCHARGER REPLACEMENT.

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  8    9    10    11    12  13  14    15    16    17    18  
img
. . . . . . .
TM 5-2420-230-24-2
L-11. ENGINE REPAIR (THERMOSTAT REPLACEMENT).
This Task Covers:
a. Removal
b. Inspection
c. Installation
d. Testing
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para 9-4
Cooling system drained.
Materials/Parts
Drawings Required
Gasket, Item 87, Appendix D
TM 5-2420-230-24P Figure 28
Personnel Required
Estimated Time to Complete
MOS 62B, Construction Equipment Repairer
Refer to MAC in Appendix B
a. Removal.
Refer to page L-101 for removal.
b. Inspection.
Refer to page L-402 for inspection.
c. Installation.
Refer to page L-198 for installation.
d. Testing.
Refer to page L-402 for testing.
e. Follow-On Maintenance.
Refill cooling system (Para 9-4).
END OF TASK
L-12
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.