TM 5-2420-230-24-2
L-13. EXHAUST MANIFOLD REPLACEMENT.
This Task Covers:
a. Removal
b. Inspection
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Turbocharger removed.
Materials/Parts
Drawings Required
Antiseize compound, Item 12, Appendix C
Gasket, Item 69, Appendix D (6)
Estimated Time to Complete
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
Allow engine to cool before performing maintenance on the muffler, exhaust pipe, exhaust manifold,
or turbocharger. If necessary, use insulated pads and gloves.
b. Inspection.
c. Installation.
Adhesives, solvents, and sealing compounds burn easily and give off vapors that are harmful to the
skin and clothing. To avoid injury or death, keep away from open fire when using these materials, and
use only in well-ventilated areas. If adhesives, solvents, or sealing compounds contact the skin or
clothing, wash immediately with soap and water, and rinse thoroughly. Failure to comply may result in
injury or death to personnel.
d. Follow-On Maintenance.
END OF TASK
Change 1