TM 5-2420-230-24-2
L-16. AFTERCOOLER REPLACEMENT.
This Task Covers:
a. Removal
b. Cleaning
c. Inspection
d. Testing
e. Installation
f. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Para 38
Hood raised.
Materials/Parts
Drawings Required
Adhesive, sealant, Item 25, Appendix C
Compound, sealing, pipe, thread, Item 22, Appendix C
Gasket, Item 74, Appendix D
Estimated Time to Complete
Gasket, Item 77, Appendix D (2)
Refer to MAC in Appendix B
Soap solution, Item 56, Appendix C
Solvent, degreasing, Item 58, Appendix C
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
Allow engine to cool before performing maintenance on the muffler, exhaust pipe, exhaust manifold,
or turbocharger. If necessary, use insulated pads and gloves.
Change 1