• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AFTERCOOLER REPLACEMENT. - Cleaning
INJECTOR NOZZLES REPLACEMENT.

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  17    18    19    20    21  22  23    24    25    26    27  
img
. . . . . . .
TM 5-2420-230-24-2
L-17. VALVE COVER REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
TM 5-2420-230-10
Hood raised.
Materials/Parts
Drawings Required
Gasket, Item 68, Appendix D (6)
TM 5-2420-230-24P Figure 20
Gasket, Item 73, Appendix D (6)
Seal, Item 229, Appendix D
Estimated Time to Complete
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
No smoking, flames, sparks, or glowing or hot objects allowed within 50 ft. (15 m) of vehicle.
Failure to comply may result in injury or death to personnel.
To prevent possible injury, wear gloves and protective eye equipment when handling fuel. Failure
to comply may result in injury or death to personnel.
Keep a fire extinguisher within easy reach when working with fuel or on a fuel system.
Do not work on fuel system when engine is hot; fuel can be ignited by a hot engine.
Refer to page L-109 for removal.
b. Installation.
Refer to page L-189 for installation.
c. Follow-On Maintenance.
Close engine hood and attach clips (TM 5-2420-230-10).
END OF TASK
L-21
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.