• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INJECTOR NOZZLES REPLACEMENT.
ENGINE REPAIR (PUSH RODS REPLACEMENT).

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  19    20    21    22    23  24  25    26    27    28    29  
img
. . . . . . . . .
TM 5-2420-230-24-2
L-19. ENGINE REPAIR (ROCKER LEVERS REPLACEMENT).
This Task Covers:
a. Removal
b. Cleaning
c. Inspection
d. Installation
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanics, Item 38, Appendix B
TM or Para
Condition Description
Para L-17
Valve covers removed.
Materials/Parts
Oil, lubricating, OE/HDO 30, Item 44, Appendix C
Drawings Required
Soap, laundry, Item 56, Appendix C
TM 5-2420-230-24P Figure 13
Personnel Required
Estimated Time to Complete
MOS 62B, Construction Equipment Repairer
Refer to MAC in Appendix B
a. Removal.
No smoking, flames, sparks, or glowing or hot objects allowed within 50 ft. (15 m) of vehicle.
Failure to comply may result in injury or death to personnel.
To prevent possible injury, wear gloves and protective eye equipment when handling fuel. Failure
to comply may result in injury or death to personnel.
Keep a fire extinguisher within easy reach when working with fuel or on a fuel system.
Do not work on fuel system when engine is hot; fuel can be ignited by a hot engine.
Refer to page L-110 for removal.
b. Cleaning.
Refer to page L-291 for cleaning.
c. Inspection.
Refer to page L-291 for inspection.
d. Installation.
Refer to page L-183 for installation.
e. Follow-On Maintenance.
Install valve covers (Para L-17).
END OF TASK
L-23
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.