TM 5-2420-230-24-2
L-45. ENGINE OIL COOLER REPAIR.
This Task Covers:
a. Disassembly
b. Cleaning
c. Inspection
d. Assembly
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Oil cooler removed.
Materials/Parts
Drawings Required
O-ring, Item 136, Appendix D
Personnel Required
Estimated Time to Complete Task
MOS 62B, Construction Equipment Repairer
Refer to MAC in Appendix B
a. Disassembly.
(1)
(2)
b. Cleaning.
c. Inspection.
(1)
(2)
d. Assembly.
(1)
(2)
e. Follow-On Maintenance.
END OF TASK
Change 1