• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE REPAIR (FAN HUB MAINTENANCE).
ENGINE REPAIR (MECHANICAL TACHOMETER DRIVE COVER REPLACEMENT).

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  52    53    54    55    56  57  58    59    60    61    62  
img
. . . . . . .
TM 5-2420-230-24-2
L-47. ENGINE REPAIR (TURBOCHARGER MOUNTING STUD REPLACEMENT).
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanics, Item 38, Appendix B
TM or Para
Condition Description
Para L-12
Turbocharger removed.
Materials/Parts
Compound, antiseize, Item 12, Appendix C
Drawings Required
TM 5-2420-230-24P Figure 39
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
Refer to MAC in Appendix B
a. Removal.
Refer to page L-423 for removal.
b. Installation.
Adhesives, solvents, and sealing compounds burn easily and give off vapors that are harmful to the
skin and clothing. To avoid injury or death, keep away from open fire when using these materials, and
use only in well-ventilated areas. If adhesives, solvents, or sealing compounds contact the skin or
clothing, wash immediately with soap and water, and rinse thoroughly. Failure to comply may result
in injury or death to personnel.
Refer to page L-423 for installation.
c. Follow-On Maintenance.
Install turbocharger (Para L-12).
END OF TASK
L-56


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.