• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE OIL COOLER REPAIR.
ENGINE REPAIR (TURBOCHARGER MOUNTING STUD REPLACEMENT).

Interim High-Mobility Engineer Excavator Nsn 2420-66-148-7692
Page Navigation
  51    52    53    54    55  56  57    58    59    60    61  
img
. . . . . . . .
TM 5-2420-230-24-2
L-46. ENGINE REPAIR (FAN HUB MAINTENANCE).
This Task Covers:
a. Disassembly
b. Inspection
c. Assembly
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, common no. 2, Item 36, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para L-10
Fan hub removed.
Materials/Parts
Drawings Required
None
TM 5-2420-230-24P Figure 27
Personnel Required
Estimated Time to Complete Task
MOS 62B, Construction Equipment Repairer
Refer to MAC in Appendix B
a. Disassembly.
Refer to page L-396 for disassembly.
b. Inspection.
Refer to page L-396 for inspection.
c. Assembly.
Refer to page L-397 for assembly.
d. Follow-On Maintenance.
Install fan hub (Para L-10).
END OF TASK
L-55
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.