• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVING PISTON PIN BUSHING ON TAPERED PIN-END ROD
INSTALL PISTON PIN BUSHING IN CONNECTING ROD

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  146    147    148    149    150  151  152    153    154    155    156  
img
TM 5-3805-280-24-2
Cylinder Block, Liners, Pistons and Rods
CLEAN AND INSPECT CONNECTING ROD
10
37
PIN BORE
1. Clean bore of rod with medium grit emery cloth.
2. Inspect for cracks or other damage. Make sure that
lube oil hole in top of straight pin-end rod is open.
IMPORTANT: If bushing has spun in rod, replace
connecting rod.
3. Measure bore diameter in two places, 90 apart.
Replace rod if not within specification.
Connecting Rod Small Pin Bore (Bushing Removed)--Specification
ID ............................................................................... 38.087--38.113 mm
(1.4995--1.5005 in.)
Connecting Rod Large Pin Bore (Bushing Removed)--Specification
ID ............................................................................... 46.025--46.051 mm
(1.8120--1.8130 in.)
RG,10,DT7405 1912NOV971/1
13-150


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.