• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHARGE BATTERY
ENGINE SPEED LEARNING PROCEDURE

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  667    668    669    670    671  672  673    674    675    676    677  
img
TM 5-3805-280-24-2
Batteries, Support, and Cables
2. Remove cap screws (A and C) and the fuse box cover
(B) to remove the rear console cover.
A--Cap Screw
B--Cover
C--Cap Screw
TX,16,UU3955
1919SEP982/3
3. Loosen EPC connectors and remove connectors (A--
C).
4. Turn charger off before connecting or disconnecting it.
5. Charge battery following manufacturer's instructions for
16
1671
your battery charger.
9
6. After battery is charged, connect the positive (+) cable,
then connect the negative (-) ground cable.
7. Push connectors into EPC controller.
A--Connector
8. Install rear console cover and fuse box cover
B--Connector
C--Connector
9. After connecting engine and pump controller, do the
Engine Speed Learning Procedure. (See procedure in
this group.)
TX,16,UU3955
1919SEP983/3
16-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.