• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHARGE BATTERY - Continued
ENGINE SPEED LEARNING PROCEDURE - Continued

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  668    669    670    671    672  673  674    675    676    677    678  
img
TM 5-3805-280-24-2
Batteries, Support, and Cables
ENGINE SPEED LEARNING PROCEDURE
When the following components are repaired or replaced,
or when engine speeds deviate from specification, the
engine speed learning procedure must be performed.
Engine
Engine speed control cable
Engine control motor and angle sensor
Engine and pump controller
Fast and slow idle stop screws
1. Stop engine. Ignition key OFF.
2. Disconnect the laptop computer from test connector.
Wait for 5 seconds.
Continued on next page
TX,05,GG2769 1918SEP981/2
16
1671
10
16-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.