• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE SPEED LEARNING PROCEDURE - Continued
REMOVE AND INSTALL ROCKDRILL CONTROL CONSOLE

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  730    731    732    733    734  735  736    737    738    739    740  
img
TM 5-3805-280-24-2
System Controls
REMOVE AND INSTALL MONITOR
CONTROLLER
1. Disconnect battery ground cable.
2. Move seat forward and remove access cover.
3. Disconnect wiring harness connectors (C).
4. Remove screws (B) and monitor controller (A).
5. Install monitor controller and connect wiring harnesses.
6. Install cover and connect battery cable. Do engine
speed recalibration. (See Engine and Pump Controller
(EPC) in this group.)
TX,16,UU3323
1923JUN941/1
16
1675
6
16-76


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.