• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
230 REMOVE AND INSTALL LEFT BOOM CYLINDER CONTROLLED LOAD LOWERING VALVE
230 REMOVE AND INSTALL RIGHT BOOM CYLINDER CONTROLLED LOAD LOWERING VALVE

Maintenance Manual For Hydraulic Excavator 230Lcr And 230Lcrd With Rock Drill 2
Page Navigation
  1030    1031    1032    1033    1034  1035  1036    1037    1038    1039    1040  
img
TM 5-3805-280-24-2
Hydraulic System
5. Disconnect pipes (B and I).
6. Disconnect hoses (A, C, G, H and J).
7. Remove four cap screws (E), flange (F) and valve (D).
Replace parts as necessary.
Left Side Valve
A--Hose
B--Pipe
C--Hose
D--Valve
E--Cap Screw (4 used)
F--Flange
G--Hose
H--Hose
I--Pipe
J--Hose
CED,OUOE020,34 1914MAR993/3
230 REMOVE AND INSTALL RIGHT BOOM
33
CYLINDER CONTROLLED LOAD LOWERING
3360
141
VALVE
1. Park machine on a firm , level surface.
Continued on next page
CED,OUOE020,35 1914MAR991/3
21-173


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.