TM 5-3805-294-10
OPERATOR MAINTENANCE
TIGHTENING TRACK TENSION
INITIAL SETUP:
Tools and Special Tools
References
Materials/Parts
Equipment Condition
Time to Complete
Personnel Required
Horizontal Construction Engineer 12N
0.1 Hour(s)
TIGHTENING TRACK
1.
Add a small amount of grease to grease fitting (Figure 1, Item 1).
HYEX00384
1
Figure 1. Tighten Track.
2.
END OF TASK
END OF WORK PACKAGE