TM 5-3805-294-10
OPERATOR MAINTENANCE
LOOSENING TRACK TENSION
INITIAL SETUP:
Tools and Special Tools
References
Wrench, Open End, 24 mm
Materials/Parts
Equipment Condition
Personnel Required
Time to Complete
Horizontal Construction Engineer 12N
0.1 Hour(s)
LOOSENING TRACK TENSION
1.
Loosen nut (Figure 1, Item 1) and allow a small amount of grease to escape.
1
HYEX00385
Figure 1.
Loosen Track.
2.
Tighten nut (Figure 1, Item 1).
3.
END OF TASK
END OF WORK PACKAGE