• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR TANK REPLACEMENT. - Continued
BRAKE CONTROL VALVE REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  599    600    601    602    603  604  605    606    607    608    609  
img
TM 5-2420-230-24-1
(3)
Air tank (16.8L).
(a)
Install fittings, if required.
(b)
Position air tank (10).
(c)
Install two air tank cables (9).
(d)
Install four new self-locking nuts (8).
(e)
Install air lines onto air tank (10).
(4)
Air tank (28L).
(a)
Install fittings, if required.
(b)
Position air tank (15).
(c)
Install two air tank cables (13) and
washers (14).
(d)
Install four new self-locking nuts (11)
and washers (12).
(e)
Install air lines onto air tank (15).
(5)
Air tank (28L).
(a)
Install fittings, if required.
(b)
Position air tank (19).
(c)
Install two air tank cables (18).
(d)
Install four new self-locking nuts (16)
and washers (17).
(e)
Install clamps as necessary.
(f)
Install air lines onto air tank (19).
Change 1
15-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.