TM 5-2420-230-24-1
This Task Covers:
a. Removal
c. Installation
d. Adjustment
b. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Equipment Condition
Special Tools
TM or Para
Condition Description
Hood raised.
FEL raised and maintenance
Materials/Supplies
arm installed.
Air system drained.
Drawings Required
Personnel Required
Estimated Time to Complete Task
MOS 62B, Construction Equipment Repairer
Ensure air pressure is drained to 0 psi (0 kPa) before taking off any air components. If pressure is not
released, components could blow off and harm personnel. The IHMEE air system is pressurized to 119 psi
(820 kPa). Do not drain air from a tank with any part of body in air spray path. Skin embolisms and/or debris
in eyes can occur from released pressure. Failure to comply may result in injury or death to personnel.
a. Removal.
NOTE
Tag all hoses, wires, and tubes and note their positions before removal.
Remove cable ties as necessary.
Cap and plug all tubes, hoses, and fittings upon removal.