TM 5-2420-230-24-1
d. Follow-On Maintenance.
(1)
(2)
Lower FEL.
(3)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Left fender removed, if required.
Air governor removed.
Power steering pump removed.
Materials/Parts
Drawings Required
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
NOTE
Ensure all hoses are disconnected and
clear before removal.
Tag all hoses and note their positions
before removal.
Cap and plug all hoses and fittings upon
removal.
Remove cable ties as necessary.
(1)
Remove air supply line (1).
(2)
Remove oil supply line (2) at bottom of air
(3)
Remove two nuts (4) and washers (5) from
engine studs (6).
(4)
Remove air compressor (3) and gasket (7). Discard gasket.
(5)
Remove elbow (8), as necessary.
Change 1