TM 5-2420-230-24-1
(3)
(4)
(5)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Condition
TM or Para
Condition Description
Air drier removed.
Materials/Parts
Drawings Required
Personnel Required
MOS 62B, Construction Equipment Repairer
Estimated Time to Complete Task
a. Removal.
(1)
Remove remaining 6 nuts, bolts, and 12 special washers securing end cover to housing.
(2)
Remove end cover and O-ring. Discard O-ring.
(3)
Using a strap wrench, remove desiccant cartridge and O-ring. Discard O-ring and cartridge.
Change 1