• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RESTORE IHMEE TO OPERATIONAL READINESS. - Continued
TOW PINTLE REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  613    614    615    616    617  618  619    620    621    622    623  
img
. . .
TM 5-2420-230-24-1
c. Assembly.
(1)
If required, install bushings (13) in upper pivot on stabilizer arm (Para 17-6).
NOTE
Apply grease to pins before installing.
(2)
Install foot plate (12) and safety bracket (10) onto stabilizer arm (4) using lower pivot pin (9), two circlips (8), and
washers (11).
d. Installation.
The stabilizer arms are heavy. To avoid
personal injury, exercise extreme care when
manually handling the stabilizer arms.
Failure to comply may result in injury or
death to personnel.
(1)
Using lifting device and sling, position
stabilizer arm (4).
(2)
Install stabilizer arm (4) onto vehicle using
upper stabilizer pivot pin (5), two
circlips (6), and washers (7).
(3)
Remove lifting device and sling from stabilizer arm (4).
(4)
Attach suitable lifting device and sling to cylinder (3).
(5)
Using lifting device and sling, lower cylinder (3) into position.
Use care when removing or installing snap and retaining rings. Snap and retaining rings are under
spring tension and can act as projectiles when released and could cause severe eye injury.
(6)
Install cylinder (3) with pin (2) and circlip (1).
e. Follow-On Maintenance.
(1)
Raise stabilizer arm (TM 5-2420-230-10).
(2)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
END OF TASK
0
Change 1
16-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.